|
5/19/10 Since 2007 the risks of flooding has been scientifically and rigorously mapped for the whole of the Walloon territory. A task which has been to a great extent carried out at the Ulg.
2/29/08 Three dam studies have just ended and three others are about to begin: the Laboratory of Applied Hydrodynamics and Hydraulic Constructions is wasting no time. Despite major progress in digital modelling, scale models are still often essential
|
|
||